Tipton West is a producing cbm field located onshore Australia and is operated by Arrow (Tipton). According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block PL 198. Buy the profile here.

An expansion project is associated with the Tipton West, namely the Surat Gas Project – Tipton West Phase 1. This project is currently in the construction stage, expected to start in 2023.

Field participation details

The field is owned by China National Petroleum and Shell.

Production from Tipton West

The Tipton West cbm field recovered 13.59% of its total recoverable reserves, with peak production expected in 2029. The peak production will approximately 670.00 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2045. The field currently accounts for approximately 2% of the country’s daily output.

Remaining recoverable reserves

The field is expected to recover 354.28 Mmboe, comprised of 2,125.70 bcf of natural gas reserves. Tipton West cbm field reserves accounts 8.62% of total remaining reserves of producing cbm fields globally.

Contractors involved in the Tipton West cbm field

Some of the key contractors involved in the Tipton West project as follows.

Design/FEED Engineering: Worley

EPC Contractors: Altrad Investment Authority

For more details on the Tipton West CBM Field, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Oil & Gas Intelligence Center, which provides detailed profiles of 34,000+ oil and gas fields, 400,000+ exploration blocks, 1,100+ LNG terminals, 3,400+ gas processing plants, 5,000+ storage terminals, and 8,000+ pipelines, 1,400+ refineries and 13,000+ petrochemical plants worldwide.