Tuban PSC is a producing conventional oil field located onshore Indonesia and is operated by PT Pertamina Hulu Energi. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block Tuban. Buy the profile here.
An expansion project is associated with the Tuban PSC, namely the Sukowati Phase 6. This project is currently in the feed stage.
Field participation details
The field is owned by PT Pertamina (Persero).
Production from Tuban PSC
The Tuban PSC conventional oil field recovered 97.64% of its total recoverable reserves, with peak production in 2005. The peak production was approximately 13.38 thousand bpd of crude oil and condensate and 13.00 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2026.
Remaining recoverable reserves
The field is expected to recover 1.54 Mmboe, comprised of 1.30 Mmbbl of crude oil & condensate and 1.45 bcf of natural gas reserves.
Contractors involved in the Tuban PSC conventional oil field
The key contractors involved in the Tuban PSC project as follows.
Other Contractors: PT Serba Dinamik Indonesia
About PT Pertamina Hulu Energi
PT Pertamina Hulu Energi, is a downstream energy company that carries out the exploration, development, production, processing and transportation of oil and natural gas. The company is headquartered in South Jakarta, Indonesia.
For more details on the Tuban PSC Conventional Oil Field, buy the profile here.