Upham Chester R recorded an increase of 2.45% in total oil and gas production to 83.6 boe/d in August 2021 when compared with the previous month, according to GlobalData’s USL48 database.
The oil and gas production of Upham Chester R declined 4.5% in August 2021 from 87.54 boe/d in August 2020.
On a YTD basis, the company’s total oil and gas production increased by 0.64% from the same period in 2020.
The company’s oil production stood at 0.06 bd in August 2021, while gas production up by 2.13% to 0.48 mmcf/d. On a YTD basis, oil production decreased by 55.83% in 2021 when compared with the same period in 2020, while gas production rose by 0.97%. Out of the total oil and gas production in August 2021, oil production held a 0.07% share, while gas production held a 99% share.
Looking at the states where Upham Chester R recorded the highest oil and gas production in August 2021, Texas figured at the top, accounting for a 100% share. The company produced 83.6 boe/d in the state in August 2021, an increase of 2.45% from the previous month.
On a YTD basis, the company produced 716.47 boe/d in Texas in 2021, recording an increase of 0.64% from the same period in 2020.
Upham Chester R witnessed the highest oil and gas production in Palo Pinto county in August 2021. Out of all the counties, Palo Pinto county held a share of 48.47% for the firm. The company produced 40.52 boe/d in Palo Pinto county in August 2021, a decrease of 13.53% in production when compared with the previous month.
On a YTD basis, the county produced 391.15 boe/d for the company in 2021, a 5.52% decrease from the same period in 2020.
Methodology
All publicly announced wells data are included in this analysis, which is drawn from GlobalData’s USL48 database that provides insights into oil and gas permits and wells as disclosed by state ministry sites.
GlobalData collects the latest production data and analyses the trends when it is made available for public disclosure by state ministries. Differences, if any, between the period of activity and the article date may be attributed to delays in the issuance of data.