Receive our newsletter – data, insights and analysis delivered to you
  1. News
May 15, 2020

Tap Oil and Mubadala to drill three development wells in Manora field

Thailand-based Mubadala Petroleum and its partner Tap Oil are set to proceed further with the drilling of three development wells in the Manora oil field in the Gulf of Thailand.

By Himaja Ganta

Thailand-based Mubadala Petroleum and its partner Tap Oil are set to proceed further with the drilling of three development wells in the Manora oil field in the Gulf of Thailand.

The three development wells, namely MNA -25, MNA -26 and MNA-27, will be part of the Manora 2020 development drilling programme. The partners will start drilling the wells using the Valaris 115 jack-up rig.

The Manora oil field is located in the G1/48 concession of the Gulf of Thailand. It lies in 44m of water approximately 80km from the coast of Thailand.

Mubadala Petroleum is the operator of the field and has a 60% interest in the offshore property. Tap Oil holds a 30% interest in the field while Northern Gulf Petroleum holds the remaining 10% interest.

According to Tap Oil, the overall estimated cost of the Manora 2020 development drilling and workover campaign is $13.48m.

The MNA-25 development well will be drilled to up to 2,400m, with a primary goal of producing oil in the 600 series reservoirs of the Manora Central Fault block. Mubadala estimates an initial production rate of 1,100 barrels of oil per day (bopd) from this well.

Content from our partners
How the North of Tyne region is leveraging its legacy to define its future
Q&A with Chevron Lubricants’ Paul Sly, global industrial OEM specialist, and Nathan Knotts, global brand technical manager
The important role of antifoam agents in oil-gas separation and amine treating

The MNA-26 horizontal development well, located in the Manora Eastern Fault Block, will be drilled up to 2,225m. Its main goal will be to produce potentially undrained oil in the 370-10 reservoir.

Mubadala also estimates an initial production rate of 1,100bopd from the MNA-26 well.

Meanwhile, the MNA-27 development well is a new deviated well from a new platform slot that will effectively twin the MNA-22 well drilled in last year.

To be drilled up to a depth of 2,011m, the MNA-27 well is estimated to have an initial production rate of 1,400bopd.

Discovered in November 2009, the Manora oil field produced first oil in November 2014.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Friday. The industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU