Red Hawk, Gulf of Mexico

Production system

Cell spar facility

Water depth

5,300ft

Wells

2

Resource

250 billion cubic feet natural gas

Production peak

120 million cubic feet per day

Production started

2004

Maximum

300 million cubic feet per day

Spar

Global Producer IX

Length

560ft

Height above water

50ft

Topsides

3 decks

Main (top) deck

112ft x 133ft

Production (middle) deck

112ft x 133ft

Spar deck

75ft x 91ft

Topsides payload

3,600t

Hull

7,200t

Tubes

7

Gas export

1in x 16in steel catenary riser

Oil export

1in x 10in steel catenary riser (future)

Operator

Anadarko Petroleum Corporation

Contractors

Technip