ConocoPhillips and Karoon Gas Australia will conduct production tests at the Kronos-1 pay sands in the Browse basin in Western Australia.

ConocoPhillips, operator of the WA-398-P well, will work on the discovery following completion of coring and a full suite of wireline logs, including pressure measurements, in the well.

Discover B2B Marketing That Performs

Combine business intelligence and editorial excellence to reach engaged professionals across 36 leading media platforms.

Find out more

The well was drilled from 5,249mRT to a total depth of 5,329mRT and currently a 4.5in liner is being installed for a production test.

Kronos-1 is located on a high block in the south-western part of the greater Poseidon trend, 15km from the Poseidon-1 well and is the third well on the greater Poseidon trend.