User Manual for Energy Rig - Offshore Technology | Oil and Gas News and Market Analysis
Join Our Newsletter - Get important industry news and analysis sent to your inbox – sign up to our e-Newsletter here
X

User Manual for Energy Rig

Instruction for installation 2/2 'Construction of scaffolding'.

  • Mounting of lifting tower for ENERGY Rig™ - assemble two lift towers
  • The lifting frame shown is assembled by LB 1200. (Length use on beams is not significant)
  • The most important element in this manual is to mount the beams in the exact height
  • The producers own tables to determine how close the beams should be placed, to achieve axial power requirement of four tons on the loaded standard

For more, please download the free Whitepaper.

More About This Company