Asharara–Az-Zawiyah is a 726km-long onshore pipeline project operated by Akakus Oil Operations. This oil pipeline, with a maximum diameter of 30 inches, starts at Wadi Al-Hayaa (Libya) and ends in Zawiya (Libya).
The Asharara–Az-Zawiyah project started operations in 1996 and is owned by National Oil Corporation of Libya.
Methodology
Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.