Druzhba “Belarus Section” is a 656km-long onshore pipeline project operated by Gomeltransneft Druzhba. This oil pipeline, with a maximum diameter of 21 inches, starts at Magileu Region (Belarus) and ends in Gomel Voblast (Belarus).

The Druzhba “Belarus Section” project started operations in 1964 and is owned by Gomeltransneft Druzhba.


The Druzhba “Belarus Section” project is associated with the 50800km Transneft Oil System.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.