Block 6 is a producing conventional oil field located onshore Oman and is operated by Petroleum Development Oman. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block Block 6 (North,Central & South Oman). Buy the profile here.

An expansion project is associated with the Block 6, namely the Marmul Polymer Phase 3 (MPP3). This project is currently in the commissioning stage, expected to start in 2023.

Field participation details

The field is owned by Government of Oman, PTT Public, Shell and TotalEnergies.

Production from Block 6

The Block 6 conventional oil field recovered 72.22% of its total recoverable reserves, with peak production in 2001. The peak production was approximately 904.24 thousand bpd of crude oil and condensate and 593.00 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2055. The field currently accounts for approximately 48% of the country’s daily output.

Remaining recoverable reserves

The field is expected to recover 4,980.93 Mmboe, comprised of 4,155.95 Mmbbl of crude oil & condensate and 4,949.88 bcf of natural gas reserves. Block 6 conventional oil field reserves accounts 1.10% of total remaining reserves of producing conventional oil fields globally.

Contractors involved in the Block 6 conventional oil field

Some of the key contractors involved in the Block 6 project as follows.

Main EPC: Petrofac

EPC Contractors: Nasma Telecommunications

Other Contractors: Weatherford International, Caterpillar, J. Barnsley Cranes, Officine Santafede and ST&H

About Petroleum Development Oman

Petroleum Development Oman LLC (PDO) is an exploration and production company. It explores, develops, produces, stores, and transports hydrocarbons. It also produces condensate, associated gas, non-associated gas, and black oil. PDO operates gas fields and processing plants on behalf of the government of the Sultanate of Oman. It pioneered the Enhanced Oil Recovery (EOR) process owing to its maturing asset base and it uses three main EOR methods; thermal, chemical, and gas. It operates projects at Rabab Harweel, Yibal, and Amal. The company is owned by the Government of Oman, Royal Dutch Shell, Total and Partex. PDO is headquartered in Muscat, the Sultanate of Oman.

For more details on the Block 6 Conventional Oil Field, buy the profile here.

GlobalData

GlobalData, the leading provider of industry intelligence, provided the underlying research used to produce this article.

This information is drawn from GlobalData’s Oil & Gas Intelligence Center, which provides detailed profiles of 34,000+ oil and gas fields, 400,000+ exploration blocks, 1,100+ LNG terminals, 3,400+ gas processing plants, 5,000+ storage terminals, and 8,000+ pipelines, 1,400+ refineries and 13,000+ petrochemical plants worldwide.