Bullerengue is a producing conventional gas field located onshore Colombia and is operated by Lewis Energy Colombia. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block Ssjn 1. Buy the profile here.
Field participation details
The field is owned by Ecopetrol and Lewis Energy Group.
Production from Bullerengue
The Bullerengue conventional gas field recovered 22.09% of its total recoverable reserves, with peak production expected in 2023. The peak production was approximately 0.43 thousand bpd of crude oil and condensate and 32.00 Mmcfd of natural gas. Based on economic assumptions, production will continue until the field reaches its economic limit in 2057. The field currently accounts for approximately 1% of the country’s daily output.
Remaining recoverable reserves
The field is expected to recover 26.87 Mmboe, comprised of 1.22 Mmbbl of crude oil & condensate and 153.86 bcf of natural gas reserves. Bullerengue conventional gas field reserves accounts 0.01% of total remaining reserves of producing conventional gas fields globally.
For more details on the Bullerengue Conventional Gas Field, buy the profile here.