Haliba is a producing conventional oil field located onshore the UAE and is operated by Al Dhafra Petroleum Operations. According to GlobalData, who tracks more than 34,000 active and developing oil and gas fields worldwide, the field is located in block Area 1. Buy the profile here.
An expansion project is associated with the Haliba, namely the Haliba Phase 2. This project is currently in the commissioning stage, expected to start in 2024.
Field participation details
The field is owned by Abu Dhabi National Oil, GS Energy and Korea National Oil.
Production from Haliba
The Haliba conventional oil field recovered 12.29% of its total recoverable reserves, with peak production expected in 2026. Based on economic assumptions, production will continue until the field reaches its economic limit in 2065. The field currently accounts for approximately 1% of the country’s daily output.
Contractors involved in the Haliba conventional oil field
Some of the key contractors involved in the Haliba project as follows.
Design/FEED Engineering: AtkinsRealis Group
Main EPC: Galfar Engineering & Contracting
EPC Contractors: Penspen
Other Contractors: Petrofac, Penspen and Aesthetix
For more details on the Haliba Conventional Oil Field, buy the profile here.
Data Insights
From
The gold standard of business intelligence.
Blending expert knowledge with cutting-edge technology, GlobalData’s unrivalled proprietary data will enable you to decode what’s happening in your market. You can make better informed decisions and gain a future-proof advantage over your competitors.