Sabal Trail is an 832km-long onshore pipeline project operated by Sabal Trail Transmission. This gas pipeline, with a maximum diameter of 36 inches, starts at Alabama (the US) and ends in Florida (the US).

The Sabal Trail project started operations in 2017 and is owned by Enbridge, NextEra Energy, and Duke Energy.


The Sabal Trail project is associated with the 202km Southeast FPL and 32km Hillabee Expansion Project Phase I.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.