South Valley is a 928km-long onshore pipeline project operated by Egyptian Natural Gas. This gas pipeline, with a maximum diameter of 36 inches, starts at Giza Governorate (Egypt) and ends in Aswan (Egypt).

The South Valley project started operations in 2009 and is owned by Egyptian General Petroleum and others.


The South Valley project is associated with the 75km El Sadat–Dahshor.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.