Offshore Technology | Oil and Gas News and Market Analysis is using cookies

We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.

ContinueLearn More X
X

Angel Gas and Condensate Project

Location

North West Shelf, Western Australia

Permit

WA-3-L

Water depth

80m

Capital expenditure

A$1.6bn

No of wells

Three

Recoverable reserves

1.85Tcf of gas, 84Mmbbls of condensate

First gas

October 2008

Peak gross rate of production

800Mmcf/day of gas, 50,000 bpd of condensate

Production method

Subsea tiebacks to new platform, comingling with production from elsewhere in NWS via hub to onshore plant

Operator

Woodside Energy (16.67% interest)

JV partners

BHP Billiton Petroleum, BP Developments Australia, Chevron Australia, Japan Australia LNG and Shell Developments (16.67% each)

Contractors

Eos JV (platform), JP Kenny (flowlines, export pipeline, power cable and tie-ins), Transfield Worley (North Rankin A modifications), Malaysian Marine Heavy Engineering (topside manufacture), Aker Kvaerner-Clough JV (topside installation)
Expand

Go Top