Tommeliten Alpha Development, North Sea

Tommeliten Alpha is a gas and condensate field located at a water depth of 75m, approximately 25km south-west of the Ekofisk field in the southern part of the Norwegian North Sea.

Project Type

Gas and condensate field development

Location

Norwegian North Sea

Water Depth

75m

Discovered

1977

Expand

Tommeliten Alpha is a gas and condensate field located at a water depth of 75m, approximately 25km south-west of the Ekofisk field in the southern part of the Norwegian North Sea.

ConocoPhillips operates the field with a 28.26% working interest. The other partners in the field are PGNiG Upstream Norway (42.38%), Total (20.23%) and Var Energi (9.13%).

In June 2019, the project moved to the Select Phase, which involves making technical decisions related to the field development such as number and type of wells, and technical specification of subsea pipeline. The field is expected to start production in 2024.

Tommeliten Alpha field location

Tommeliten gas and condensate field, comprising Gamma and Alpha deposits, lies in Block 1/9 in the production licence (PL) 044 in the North Sea.

Tommeliten Alpha discovery is located in Block 1/9-1.

Tommeliten Alpha field geology and reserves

The oil and condensate in the field are found at a depth of approximately 3,000m in the chalk layers of the Paleocene Ekofisk and Upper Cretaceous Tor formations.

The Gamma deposit holds total recoverable reserves of 24.5 million barrels of oil, 9.7 billion standard cubic meters (scm) of gas and 0.5 million tonnes (Mt) of natural gas liquid (NGL). Tommeliten Alpha is estimated to contain total recoverable reserves of approximately 12.8 billion cubic metres (bcm) of natural gas, 5Mt of oil and 0.5Mt of NGL.

Tommeliten Alpha field discovery and appraisal

The Tommeliten Alpha was discovered by the exploratory well 1/9-1 in 1977. Another wildcat well, 1/9-1 R, was spud in 1987 to prove the presence of gas and condensate in the field.

The appraisal wells, 1/9-2 and 1/9-3 R, encountered oil, and gas and condensate, respectively.

In 2003, ConocoPhillips drilled a wildcat well 1/9-7 to evaluate the hydrocarbons potential in the Upper Jurassic age sandstone as well as to delimit the Tommeliten Alpha discovery in Cretaceous rocks. The well was drilled to a vertical depth of 4,947m below the seafloor, using Maersk Giant jack-up rig.

Hydrocarbons were identified in Cretaceous rocks but not in the Upper Jurassic age sandstones. All the wells were plugged and abandoned.

Tommeliten Alpha field development details

Tommeliten Alpha will be developed with a subsea production system comprising wellheads, ten vertical subsea trees, two manifolds, satellite structures, as well as control and tie-in equipment.

The field will be tied back to the existing infrastructure of the Ekofisk complex for cost-efficient development of the project.

Details of Ekofisk complex

Ekofisk area lies in Block 2/4 of PL018, at a water depth of 70m to 75m in the southern part of the Norwegian North Sea. The area includes Ekofisk field, Embla, Tor, Cod, Mime, Edda, West Ekofisk, Albuskjell and Tommeliten Gamma fields.

Discovered in 1969, the Ekofisk field was developed in two phases, Ekofisk I, which was shut down in 1998, and Ekofisk II. The Ekofisk complex contains a centrally located installation linked to other platforms by bridges.

Tommeliten Gamma details

Tommeliten Gamma was approved for development in January 1986, while it came on stream in October 1988. Production from the Gamma field ceased in August 1998.

The field was developed with a subsea production system for producing hydrocarbons from six wells located at a water depth of 83m. The produced gas and condensate from the field was transported through a nine-inch pipeline to the Edda 2/7 C platform located 11.8km away for processing.

Contractor

Aker Solutions will perform the front-end engineering and design (FEED) for the project under a contract received in October 2020. The contractual scope will include modifications on the Ekofisk installations for the integration of the Tommeliten Alpha discovery.

The FEED work is anticipated to be completed in the second quarter of 2021. The contract also includes an option for as well as engineering, procurement and construction, and installation (EPCI) work.

The company received another contract worth Nkr1.2bn ($127.5m) in the same month to provide a subsea production system for the development.

Related Projects

Meliwis Gas Field

Meliwis gas field is located in the Madura Offshore PSC situated in East Java, Indonesia. The field was discovered in…

Paus Biru Field

Paus Biru is a gas filed located in East Java Basin of Indonesia and part of the Sampang production sharing…