Offshore Technology | Oil and Gas News and Market Analysis is using cookies

We use them to give you the best experience. If you continue using our website, we'll assume that you are happy to receive all cookies on this website.

ContinueLearn More X
DOWNLOAD WHITEPAPER

Assembly and Maintenance Procedure for Bondura 6.1

The Bondura bolt is type-approval certificated by DNV and follows guidelines by API specifications 8c, DNV rules for lifting appliances, FEM rules for heavy lifting appliances, NS 5514 crane standard.

Assembly Procedure

Preparations:

Remove any burr. Clean the support.

Align the bolt hole. The middle section must line up with the support on each side. Use a jack or hoist if necessary. If the bolt is hammered into a hole where the bearing and the support does not line up, the bolt may be damaged.

For the full assembly procedure, please download this free white paper.



Download to find out more.

Close
Close
Close

Go Top