The 536km-long, upcoming Rafsanjan–Isfahan project will be operated by Iranian Oil Pipeline and Telecommunication. This onshore, product pipeline, with a maximum diameter of 20 inches, will start in Kerman (Iran) and ends in Isfahan (Iran).

The Rafsanjan–Isfahan project is expected to commence operations in 2022 and will be owned by National Iranian Oil Refining and Distribution.


The Rafsanjan–Isfahan project is associated with the 485km Bandar Abbas–Rafsanjan.

During the period 2021-2025, the Rafsanjan–Isfahan project is expected to witness an estimated capex of $45.9m.

Contractors involved in the Rafsanjan–Isfahan project:

Some of the key contractors for the Rafsanjan–Isfahan include –

Main EPC: Aras Bonyad, Asfalt Tous, Behin Saman Sarzamin, Tarh-o-Bazresi.

Methodology

Information on the pipeline is sourced from GlobalData’s Oil & Gas Pipelines database that provides detailed information on all active and upcoming, crude oil, natural gas, petroleum products and Natural Gas Liquids (NGL) trunk pipelines globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.