View all newsletters
Receive our newsletter – data, insights and analysis delivered to you
  1. Market Data
May 2, 2022

Zory 1 CBM Field, Poland

By Carmen

Zory 1 is a producing cbm field located onshore Poland and is operated by Gazkop 1. The field is located in block Zory 1.

Field participation details

The field is owned by Gazkop 1.


Production from Zory 1

The Zory 1 cbm field recovered 37.34% of its total recoverable reserves, with peak production in 2021. Based on economic assumptions, production will continue until the field reaches its economic limit in 2079.


Remaining recoverable reserves

The field is expected to recover 0.34 Mmboe, comprised of 2.03 bcf of natural gas reserves. Zory 1 cbm field reserves accounts 0.01% of total remaining reserves of producing cbm fields globally.


Methodology

Information on the field is sourced from GlobalData’s fields database that provides detailed information on all producing, announced and planned oil and gas fields globally. Not all companies mentioned in the article may be currently existing due to their merger or acquisition or business closure.

Related Companies

NEWSLETTER Sign up Tick the boxes of the newsletters you would like to receive. The top stories of the day delivered to you every weekday. A weekly roundup of the latest news and analysis, sent every Friday. The industry's most comprehensive news and information delivered every month.
I consent to GlobalData UK Limited collecting my details provided via this form in accordance with the Privacy Policy
SUBSCRIBED

THANK YOU