Skip to site menu Skip to page content

Dual Diameter, Bi-Directional Pigging for Pipeline Pre-Commissioning

By Pipeline Research Limited

This paper from Pipeline Research Limited examines the issues associated with dual diameter, bi-directional pigging specifically for pipeline pre-commissioning. The technique can be used to flood and subsequently dewater a pipeline without the need for temporary subsea traps or additional support vessels.

An example is the Alve Pipeline in Norway. This 16km flow-line from the Norne Platform to the Alve Manifold includes 10” and 12” pipe section. The line was flooded from Norne using the pig with oxygen scavenge seawater and then dewatered using produced gas from the well. The pigs needed to have a high efficiency since very low velocities were used to flood the line and in order to avoid hydrates on dewatering. Dual diameter wheel pigs were employed with non-buckling disc type seals. This paper describes the design of the pigs and the seals to achieve the required functionality. The test facility and testing performed to verify the pig performance is also described. Finally, an overview of the offshore pigging operation is provided.

Download this free white paper for more information.

Enter your details below to view the free white paper

By downloading this whitepaper, you acknowledge that GlobalData may share your information with our white paper partners/sponsors who may contact you directly with information on their products and services.

Visit our Privacy Policy for more information about our services, how GlobalData may use, process and share your personal data, including information on your rights in respect of your personal data and how you can unsubscribe from future marketing communications. Our services are intended for corporate subscribers and you warrant that the email address submitted is your corporate email address.

Related Content